Flat Roof Refurbishment for Primary Schools: Green Gates

Discover More Here
Project Overview:
DVC Commercial Roofing, a leading commercial roofing company nationwide, was appointed to deliver a full roof refurbishment at Green Gates Primary School covering approximately 1,400m². The project involved a complete strip back to the timber deck across all flat roof areas, replacing a heavily deteriorated system that had developed through multiple historic repair layers.
The existing roof was found to consist of approximately five layers of aged capsheet, forming a complex build-up typical of older flat commercial roofing systems that have undergone repeated maintenance over time.
These layers were carefully removed to expose the structural deck before installing a modern high-performance system. The new build-up included a vapour control layer (VCL), PIR insulation, and a premium waterproofing solution using Alumasc Derbigum Olovine, improving both durability and thermal performance.
This project reflects DVC’s expertise as a trusted commercial roofing contractor, delivering reliable solutions across sensitive and occupied environments such as a school.
Challenges and Solutions:
The primary challenge on this project was the removal of the multiple bonded capsheet layers, which had become extremely tough and time-consuming to strip. The process required a slow, controlled and methodical approach to avoid damaging the underlying timber deck, making this a highly technical roof installation project.
Additional complexity arose from the fact that works were carried out within a live primary school environment, as a result, the project required detailed planning ensuring full segregation between working zones and occupied areas. Works commenced while the school remained fully operational, requiring strict health and safety controls and continuous coordination with school staff.
DVC Roofing implemented a phased programme of works to manage logistics, minimise disruption, and maintain safe access at all times. Careful sequencing was essential due to ongoing school activities at both the start and later stages of the programme.
Material selection was also critical. Alumasc Derbigum Olovine was chosen for its proven performance in projects, offering long-term waterproofing reliability, durability, and suitability for education sector environments.
Outcomes and Benefits:
Despite the challenges, the project was successfully delivered within a 26-week programme, demonstrating DVC’s capability as trusted contractors delivering complex schemes efficiently.
The completed system significantly enhances the building’s performance, improving weather protection, thermal efficiency, and overall lifespan. The installation of PIR insulation and a VCL has upgraded the building to modern energy standards, contributing to improved internal comfort and reduced heat loss.
This project also highlights DVC’s ability to deliver roof replacements with minimal disruption to live operational environments. Through careful coordination and programme management, the school was able to continue functioning safely throughout the works.
The result is a durable, long-lasting roofing system that reduces future maintenance requirements while providing a high-quality finish suited to long-term educational use.

FAQ:
What type of roofing system was used?
A complete roof strip and replacement system was installed, comprising PIR insulation, a vapour control layer (VCL) and a Derbigum Olivine waterproofing finish. This provided a fully renewed roofing
What were the main challenges?
The main challenge was stripping multiple bonded capsheet layers in a live school environment, requiring careful logistics and controlled removal typical of complex commercial roof installation projects.
How was disruption managed?
Through phased working zones, strict safety controls, and coordination with school operations, ensuring minimal impact on daily activities while maintaining safe access routes.
Why was Alumasc Derbigum Olovine chosen?
It was selected for its durability, longevity, and proven success in flat commercial roofing applications, particularly in sensitive public-sector buildings.
What are the key benefits of the completed works?
Improved thermal efficiency, enhanced weather protection, reduced maintenance requirements, and a significantly extended roof lifespan.