Flat Roof Repair for KIER Capital Projects in Cumbria
Project Overview:
DVC Roofing was appointed by KIER Capital Projects in April 2017 to undertake commercial flat roof refurbishment works at Thursby Primary School in Cumbria, following a competitive tender process.
Having previously worked with KIER on live school environments, DVC was selected as a preferred roofing subcontractor due to its experience, reliability and ability to operate safely within occupied educational buildings.
The project involved installing a high-performance flat roofing solution designed to provide a 20-year service life, alongside upgrading the school’s roof insulation to improve thermal performance and energy efficiency.
The works were delivered in close collaboration with KIER, the Head Teacher, the Local Authority and their appointed consultants, ensuring the project was completed safely, on time and within budget.
Project Challenges:
Working Within a Fully Occupied School, one of the main challenges was completing the roofing works during term time, while Thursby Primary School remained fully operational.
With students, teachers and other staff on site throughout the project, maintaining a safe working environment was essential.
DVC Roofing worked closely with the Head Teacher, KIER and the Local Authority to coordinate the works, implement appropriate health and safety procedures and carefully manage access to the working areas.
Detailed planning and flexible scheduling helped minimise disruption to lessons and the school’s everyday activities, while ensuring the roofing programme progressed efficiently.
Managing Unpredictable Weather Conditions
The exposed roof presented additional challenges due to the unpredictable British weather.
Rain and strong winds had the potential to interrupt installation works, compromise the quality of the roofing system and cause delays to the project programme.
To manage these risks, the DVC Roofing team closely monitored weather forecasts and maintained contingency plans to accommodate changing conditions.
This proactive approach enabled the team to maintain progress and deliver the works without compromising safety or installation quality.
Our Roofing Solution:
Installation of the IKO Mach One Roofing System. DVC Roofing installed a high-performance IKO Mach One roofing system, providing a durable waterproofing solution designed to protect the school building over the long term.
The installation was carefully planned and coordinated to ensure the new roofing system met the project’s performance requirements and delivered the specified 20-year design life.
The project demonstrates DVC’s experience in delivering specialist commercial roofing installations for educational buildings and public-sector clients.
Improving Roof Insulation and Thermal Efficiency was anĀ important part of the refurbishment was upgrading the school’s roof insulation.
By incorporating high-quality insulation materials with improved thermal performance, DVC Roofing enhanced the building’s ability to retain heat and reduce unnecessary energy loss through the roof.
The insulation’s thermal performance is measured using its U-value. A lower U-value indicates better insulation and reduced heat transfer through the building fabric.
Improved roof insulation can help:
- Reduce heat loss through the roof.
- Improve internal comfort for pupils and staff.
- Reduce the energy required to heat the building.
- Lower ongoing heating costs.
- Improve the building’s overall energy efficiency.
This upgrade provided the school with long-term benefits beyond the installation of a new waterproofing system.
Project Results and Benefits:
The successful completion of the Thursby Primary School project delivered a number of important benefits for the client and building occupants. Improved waterproofing protection: The IKO Mach One roofing system provided a robust, long-lasting flat roof solution.
Enhanced thermal performance: Upgraded insulation improved the building’s ability to retain heat.
Reduced energy consumption: Better thermal efficiency helps reduce heating requirements and associated energy costs.
Safe project delivery: Careful planning and coordination ensured the works could be completed while the school remained operational.
Minimal disruption: Flexible scheduling and close communication helped maintain the school’s daily activities throughout the project.
Long-term performance: The roofing solution was designed to provide a 20-year service life.
The completed installation at Thursby Primary School demonstrates DVC Roofing’s ability to deliver technically demanding commercial roof refurbishment projects while maintaining high standards of safety, quality and programme management.